Introduced in House
Protecting Ratepayers Act
SEC. 1. SHORT TITLETrack this section →
This Act may be cited as the Protecting Ratepayers Act.
SEC. 2. DEFINITIONSTrack this section →
In this Act: (1) Covered entity The term covered entity means a private company, or other private entity, that— (A) owns, operates, or maintains a data center; or (B) has plans to own, operate, or maintain a data center within the next 5 years. (2) Data center The term data center means a data center, as defined in section 453(a) of the Energy Independence and Security Act of 2007 (42 U.S.C. 17112(a)), with a power demand of 5 megawatts or more. (3) Existing data center The term existing data center means a data center that has begun operations as of the date of enactment of this Act. (4) New data center The term new data center means a data center or planned data center that is not yet operational as of the date of enactment of this Act.
SEC. 3. DATA CENTER REQUIREMENT FOR OFF-GRID POWER AND WATER SUPPLYTrack this section →
Beginning on the date that is 180 days after the date of enactment of this Act, a covered entity may not build, own, operate, or maintain a new data center or existing data center unless the data center derives all— (1) energy, including back-up energy, from a captive power plant, on-site power generation, or some other source or combination of sources separate from, and not deriving power from, the electric grid; and (2) water, including back-up water, from an on-site water source, or some other water source or combination of sources separate from, and not deriving water from, the public water system.
SEC. 4. RATEPAYER PROTECTION PLEDGETrack this section →
Proclamation of the President issued on March 9, 2026, titled Ratepayer Protection Pledge (91 Fed. Reg. 11439) shall have the full force and effect of law.