Early access: 15,549 bills from the current Congress so far, more added daily. Data from Congress.gov, GovInfo and the House and Senate vote records, updated Oct 13, 2026.
Public Law TrackerPLTPublic Law Tracker
S. 4014IntroducedSenate · nowHousePresidentLawIn committee
Sec. 1 · S. 4014

Conveyance to Nisqually Indian Tribe of Clear Creek Hatchery infrastructure

Read this section in the full bill →

This section appears in one version only, so there is nothing to compare yet.

(a) Definitions In this section: (1) Clear Creek Hatchery The term Clear Creek Hatchery means the area generally depicted as Clear Creek Hatchery on each covered map. (2) Covered infrastructure (A) In general The term covered infrastructure means each of the following items generally depicted on a covered map: (i) Asphalt Pond #11. (ii) Asphalt Pond #13. (iii) Asphalt Pond #14. (iv) Asphalt Pond #15. (v) Asphalt Pond #16. (vi) Clear Creek Spring. (vii) Dam 1. (viii) Dam 2. (ix) Fish Ladder. (x) Hillside Spring. (xi) Incubation Room. (xii) Lower Forebay. (xiii) Lower Site Discharge. (xiv) Pollution Abatement Ponds. (xv) Raceways. (xvi) Spring 1. (xvii) Spring 2. (xviii) Spring 3. (xix) Upper Forebay. (xx) Upper Site Re-Use Flow. (xxi) Water Tower. (xxii) Well 1. (xxiii) Well 2. (xxiv) Well 3. (xxv) Well 4. (xxvi) Well 5. (B) Inclusions The term covered infrastructure includes— (i) each pipe, electrical and communication conduit, and other infrastructure within a Clear Creek Hatchery associated with each item described in subparagraph (A); and (ii) each security fence and road within a Clear Creek Hatchery. (3) Covered map The term covered map means each of the following maps: (A) The map entitled Nisqually Indian Tribe Clear Creek Hatchery Lower Site and dated December 3, 2024. (B) The map entitled Nisqually Indian Tribe Clear Creek Hatchery Upper Site and dated December 3, 2024. (4) Secretary The term Secretary means the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service. (b) Conveyance required Not later than 90 days after the date of enactment of this Act, the Secretary shall convey to the Nisqually Indian Tribe all right, title, and interest of the United States in and to the covered infrastructure. (c) Requirements The conveyance required under subsection (b) shall be— (1) subject to valid existing rights; and (2) for no consideration. (d) Map and legal description (1) In general As soon as practicable after the date of enactment of this Act, the Secretary shall finalize a map and a legal description of each item to be conveyed under subsection (b). (2) Controlling document In the case of a discrepancy between the map and legal description finalized under paragraph (1), the map shall control. (3) Corrections The Secretary and the Nisqually Indian Tribe, by mutual agreement, may correct any minor errors in the map or legal description finalized under paragraph (1). (4) Availability The map and legal description finalized under paragraph (1) shall be kept on file and available for public inspection in each appropriate office of the United States Fish and Wildlife Service.