Sec. 2107 · H.R. 2347

Ratepayer protection

Division B — Committee on Energy and Natural Resources › Title I — Electric transmission

Read this section in the full bill →

This section appears in one version only, so there is nothing to compare yet.

(a) FERC pricing policy for transmission services provided by public utilities and transmitting utilities (1) Findings Congress finds that— (A) it is the policy of the United States that computational load owners and computational load operators bear the full cost of any electric service that they require and the full cost of any infrastructure built to serve them, regardless of whether they take the electric service that they request, so that such costs are not borne by other customers, including residential customers; (B) it is not just and reasonable within the meaning of sections 205 and 206 of the Federal Power Act (16 U.S.C. 824d, 824e) for any public utility or transmitting utility to maintain rates, terms, or conditions of service that, by their terms, charge less than the embedded costs and incremental expansion costs to eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators; (C) transmission costs incurred in response to transmission service from eligible computational load customers should be fully assigned to such customers so as to minimize or avoid the cost burden on other customers; and (D) computational load owners and computational load operators should incur the full cost of the transmission service they require. (2) Definitions In this subsection: (A) 1994 transmission pricing policy statement The term 1994 transmission pricing policy statement means the policy statement issued by the Commission on October 26, 1994, and published in the Federal Register on November 3, 1994, relating to Inquiry Concerning the Commission’s Pricing Policy for Transmission Services Provided by Public Utilities Under the Federal Power Act; Policy Statement (59 Fed. Reg. 55031). (B) Commission The term Commission means the Federal Energy Regulatory Commission. (C) Computational load operator The term computational load operator means an entity that operates a computational load site. (D) Computational load owner The term computational load owner means an entity that owns a computational load site. (E) Computational load site (i) In general The term computational load site means 1 or more buildings, structures, or installations at a single location that— (I) primarily contain information technology infrastructure used for— (aa) creating, executing, and delivering software applications and services; (bb) artificial intelligence training, deployment, and delivery; (cc) cryptocurrency mining; or (dd) other computational activities at a data center; and (II) are supplied through electrical equipment that is connected to the bulk-power system (as defined in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a))). (ii) Exclusion The term computational load site does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A). (F) Eligible computational load customer The term eligible computational load customer has the meaning given the term by the Commission by rule or order. (G) Public utility The term public utility has the meaning given the term in section 201(e) of the Federal Power Act (16 U.S.C. 824(e)). (H) Transmitting utility The term transmitting utility has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (3) Revisions of policy statement (A) In general Not later than 90 days after the date of enactment of this Act, the Commission shall— (i) revise the 1994 transmission pricing policy statement— (I) to require public utilities and transmitting utilities to charge eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators the embedded cost and a reasonable assessment, as determined by the Commission, of the incremental cost of transmission service; (II) to ensure that any incremental costs paid are credited to the annual transmission revenue requirement of the applicable public utility or transmitting utility to prevent double recovery from other customers; and (III) to provide for a lower cost of transmission service for eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators that elect non-firm transmission service; and (ii) issue a notice of proposed rulemaking requiring public utilities and transmitting utilities— (I) to establish or revise transmission rates for eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators in accordance with that revised transmission pricing policy statement; (II) to conduct a standardized analysis to identify a reasonable assessment of the incremental costs of transmission service to eligible computational load customers; (III) to conduct a standardized analysis to identify and evaluate cost reduction options; (IV) to provide a transmission rate that includes the embedded cost and a reasonable assessment of the incremental cost of transmission service to eligible computational load customers; and (V) to establish or revise transmission rates for existing customers to go into effect following the issuance of the final rule under subparagraph (B), consistent with subclauses (I) through (IV). (B) Final rule Not later than 1 year after the date on which the notice of proposed rulemaking described in subparagraph (A)(ii) is issued, the Commission shall issue a final rule requiring public utilities and transmitting utilities to establish or revise transmission rates for eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators. (C) Cost assignment In revising the 1994 transmission pricing policy statement and issuing a notice of proposed rulemaking and final rule under this paragraph, the Commission may treat eligible computational load customers seeking transmission service on behalf of computational load owners and computational load operators as a customer class and assign some or all costs to the class rather than to individual customers. (D) Coordination (i) Regional and interregional transmission plans For transmission facilities subject to section 216(f) of the Federal Power Act, selected under section 225 of that Act, or pursuant to a Commission rule or order, a reasonable assessment of the incremental cost shall be such costs assigned under each respective section or Commission rule or order. (ii) Consolidated planning process For transmission facilities selected pursuant to section 228 of the Federal Power Act, a reasonable assessment of the incremental cost shall be such costs assigned under such section or an applicable Commission rule or order. (b) Ratepayer protection with respect to data centers Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2106) is amended by adding at the end the following: 229. Ratepayer protection with respect to data centers (a) Definitions In this section: (1) Commission The term Commission means the Federal Energy Regulatory Commission. (2) Computational load operator The term computational load operator means an entity that operates a computational load site. (3) Computational load owner The term computational load owner means an entity that owns a computational load site. (4) Computational load site (A) In general The term computational load site means 1 or more buildings, structures, or installations at a single location that primarily contain information technology infrastructure used for— (i) creating, executing, and delivering software applications and services; (ii) artificial intelligence training, deployment, and delivery; (iii) cryptocurrency mining; or (iv) other computational activities at a data center. (B) Exclusion The term computational load site does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is a commercial or industrial activity other than an activity described in subparagraph (A). (5) Retail embedded cost The term retail embedded cost means the average cost of retail service reflected in the rates otherwise in effect for the customer class that would apply to the applicable computational load owner or computational load operator. (6) Retail incremental cost The term retail incremental cost means a reasonable assessment of costs that would be avoided had a specific computational load owner or computational load operator not been served by an electric utility, including all costs to construct, own, and operate power generation or storage resources and electric transmission and distribution services associated with serving the computational load site. (7) State The term State includes— (A) an applicable State commission; and (B) any other State authority with jurisdiction over retail electric service. (8) Transmission service category The term transmission service category means a class of transmission service provided under a tariff on file with the Commission, including— (A) network integration transmission service; (B) point-to-point transmission service; and (C) any interim, non-firm, contract demand, or other service that limits— (i) the quantity of energy a load may withdraw from the transmission system; or (ii) the conditions under which the load may withdraw energy from the transmission system. (b) Ratepayer protection floor (1) No subsidy of data centers No portion of the retail incremental cost may be allocated to, or recovered in the rates of, any customer other than a computational load owner or a computational load operator. (2) Surplus permitted Paragraph (1) does not limit the authority of a State under subsection (c)— (A) to recover from a computational load owner or computational load operator amounts in excess of the retail incremental cost; or (B) to credit those amounts to other customers as a rebate or a reduction to the electric utility costs that are used as a basis for the calculation of customer rates. (3) Continuing recovery on exit A rate, charge, or agreement for service to a computational load site shall be designed to recover from the computational load owner or computational load operator the full retail incremental cost of the electric utility, and such recovery shall continue notwithstanding the termination by the computational load owner or computational load operator of a contract or other agreement pertaining to the sale of electric energy, or the cessation by the computational load owner or computational load operator of the purchase of electric energy, before that retail incremental cost has been fully recovered. (4) Financial assurance Before constructing, or making an upgrade to, a generation, transmission, or distribution facility necessary to serve a computational load site, an electric utility shall require the computational load owner or computational load operator to provide reasonable financial assurances or contributions sufficient to cover the expected cost of, or upgrade to, the computational load site, subject to the condition that any financial assurances or contributions provided by the applicable computational load owner or computational load operator to a public utility or Transmission Organization for the same computational load site or upgrade shall be credited against the requirement of this paragraph. (c) State authority to hold open seasons and competitive solicitations and set certain rates (1) In general Notwithstanding any other provision of this Act, in accordance with subsection (b)(3), a State may, with respect to retail electric service to computational load owners and computational load operators— (A) establish rates, charges, or contract terms that recover more than the retail embedded cost, and more than the retail incremental cost, of serving a computational load site; (B) require that revenue collected from a computational load owner or computational load operator in excess of retail incremental cost be credited or applied to reduce the rates of other retail customers; (C) in effectuating the policy described in this paragraph, use an open season or competitive solicitation to allocate among computational load owners and computational load operators the opportunity to obtain and contract for retail electric service, making awards in such manner as returns the greatest benefit to other ratepayers on a net present value basis, notwithstanding the order in which applications or requests for service are received from computational load owners or computational load operators or any other basis for making such awards, subject to the condition that each award under such an open season or competitive solicitation shall specify the maximum quantity of firm demand awarded, in megawatts, and the transmission service category on the basis of which the computational load site is to be served; (D) condition the provision of retail electric service to a computational load site on the procurement, construction, or contracting by the computational load owner or computational load operator for new generation resources sufficient to serve the demand of the computational load site; and (E) condition the provision of retail electric service to a computational load site on the computational load owner or computational load operator taking, or agreeing to take, a transmission service category that limits— (i) the quantity of energy the computational load site may withdraw from the transmission system; or (ii) the conditions under which the computational load site may withdraw energy from the transmission system. (2) Priority of open seasons and State competitive solicitations (A) Broad discretion For purposes of an open season or competitive solicitation under paragraph (1), a State shall, with respect to retail electric service to a computational load owner or computational load operator, be afforded broad discretion to conduct, to authorize an electric utility to conduct, or to require an electric utility to conduct an open season or competitive solicitation to allocate the opportunity to interconnect, or to obtain service for, a computational load owner or computational load operator. (B) Electric utility filing An electric utility may file with a State an application to conduct an open season or competitive solicitation under subparagraph (A). (C) Authority to require A State may require an electric utility to conduct an open season or competitive solicitation under subparagraph (A). (d) Protection of American industry A State may— (1) treat computational load owners and computational load operators as a separate class of retail electric service; and (2) establish rates, charges, terms, conditions, and interconnection or service priorities for computational load owners and computational load operators that differ from, and that are less favorable than, those applicable to other large industrial, manufacturing, or commercial loads. (e) Rules of construction (1) State and Federal authority Nothing in this section expands or diminishes the jurisdiction of the Commission or any State, including— (A) State authority over retail electric service, rate design, and resource planning; and (B) Commission authority over rates, terms, and conditions of service with respect to transmission service of electric energy in interstate commerce. (2) Recognition of reserved State authority (A) In general The authority described in subsection (c)(1) is an attribute of the reserved authority of the States over retail electric service. (B) Clarification This section— (i) recognizes and confirms the authority described in subparagraph (A); and (ii) is not the source of that authority. (f) Applicability (1) Prospective application Subsections (b) and (c) apply to any computational load site that interconnects on or after the date of enactment of this section. (2) Existing arrangements (A) In general Any arrangement to serve a computational load site that was approved by a State before the date of enactment of this section shall remain in effect, subject to subparagraph (B). (B) State revisions To the extent permissible under applicable State law, a State may revise an arrangement described in subparagraph (A) to achieve consistency, beginning on the effective date of the revision, with subsections (b) and (c)..