Early access: 17,112 bills from the current Congress so far, more added daily. Data from Congress.gov, GovInfo and the House and Senate vote records, updated Nov 28, 2026.
Public Law TrackerPLTPublic Law Tracker
H.R. 2347IntroducedHouseSenatePresident · nowLawPassed both chambers
Sec. 2109 · H.R. 2347

Grid-enhancing advanced transmission technologies

Division B — Committee on Energy and Natural Resources › Title I — Electric transmission

Read this section in the full bill →

This section appears in one version only, so there is nothing to compare yet.

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2108(d)) is amended by adding at the end the following: 232. Use of grid-enhancing advanced transmission technologies (a) Definitions In this section: (1) Best-available class of transmission conductor The term best-available class of transmission conductor means a class of high-performance transmission conductors that, as determined by the Commission— (A) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level; (B) provides the highest feasible and commercially available electrical efficiency at that voltage level; (C) provides the greatest feasible and commercially available level of mechanical performance, taking into account relevant factors, including reliability, safety, and affordability; and (D) provides an economically reasonable alternative to a transmission conductor that is not a high-performance transmission conductor. (2) Commission The term Commission means the Federal Energy Regulatory Commission. (3) Covered project The term covered project means the construction of a new, or the modification, upgrade, replacement, or reconductoring of an existing, transmission facility subject to the jurisdiction of the Commission under section 201(b). (4) Grid-Enhancing advanced transmission technology The term grid-enhancing advanced transmission technology means— (A) dynamic line rating; (B) advanced power flow control; (C) transmission topology optimization; and (D) high-performance transmission conductors. (b) Use of grid-Enhancing advanced transmission technologies In exercising its authority under sections 205 and 206, the Commission shall require that public utilities— (1) evaluate their transmission systems to assess all technically achievable opportunities to deploy grid-enhancing advanced transmission technologies, including the costs and benefits of such deployment; and (2) when carrying out covered projects, use grid-enhancing advanced transmission technologies, including transmission conductors in the best-available class of transmission conductors, whenever the benefits of doing so would exceed the costs. (c) Presumption of prudence for grid-Enhancing advanced transmission technologies In any filing seeking to recover the cost of a grid-enhancing advanced transmission technology for a covered project, and in any proceeding to determine whether that cost may be recovered through rates, the Commission shall presume that— (1) the use of a grid-enhancing advanced transmission technology is a prudent practice; (2) the costs associated with the use of a grid-enhancing advanced transmission technology are just and reasonable; and (3) the costs associated with the use of a grid-enhancing advanced transmission technology provide an economically reasonable alternative to the use of transmission technologies that are not grid-enhancing advanced transmission technologies. (d) Applicability The requirements of this section apply only to public utilities and only with respect to covered projects. (e) Rulemaking (1) In general Not later than 1 year after the date of enactment of this section, the Commission shall issue an order or rule to implement this section. (2) Requirements In issuing an order or rule under paragraph (1), the Commission shall— (A) require that each public utility conducts, on Commission-established timelines, a recurring evaluation of the transmission systems of the public utility— (i) to determine when the benefits associated with deploying grid-enhancing advanced transmission technologies through covered projects, including benefits to the current transmission system of the public utility, outweigh the costs (such that the applicable benefit-cost ratio is greater than 1); (ii) that evaluates whether the costs for which recovery is sought achieve the highest net benefit at least cost for the applicable covered projects; and (iii) that considers planning and construction timelines and outages for new transmission assets and risks and impacts of potential delays; (B) require that, for any covered project for which the benefits of deploying a grid-enhancing advanced transmission technology outweigh the costs (such that the applicable benefit-cost ratio is greater than 1), the applicable public utility shall deploy the grid-enhancing advanced transmission technology based on general schedules for deployment, as determined by the Commission; (C) require that decisions on whether to implement grid-enhancing advanced transmission technologies based on the recurring evaluations under subparagraph (A) are reported to the Commission, in a manner determined by the Commission; (D) in consultation with the Secretary of Energy, establish a methodology for determining whether a transmission conductor is in the best-available class of transmission conductors for purposes of this section; (E) provide for periodic review and updating of the methodology established under subparagraph (D) not less frequently than annually to reflect improvements in technology, materials, and system performance; and (F) determine a penalty for any public utility that fails to deploy the relevant grid-enhancing advanced transmission technologies when the applicable benefit-cost ratio is greater than 1 in a timeframe determined by the Commission, including a reduction of the effective return on equity for the transmission system of the public utility..