Early access: 15,547 bills from the current Congress so far, more added daily. Data from Congress.gov, GovInfo and the House and Senate vote records, updated Oct 13, 2026.
Public Law TrackerPLTPublic Law Tracker
H.R. 8800IntroducedHouseSenate · nowPresidentLawIn the Senate
Sec. 2872 · H.R. 8800

Report on underutilized Air National Guard airfield infrastructure

Division B — Military Construction Authorizations › Title XXVIII — Military Construction General Provisions › Subtitle G — Reports and Other Matters

Read this section in the full bill →

This section appears in one version only, so there is nothing to compare yet.

(a) In general Not later than 180 days after the date of the enactment of this section, the Secretary of the Air Force shall, in consultation with the Chief of the National Guard Bureau and the Commander of United States Strategic Command, submit to the congressional defense committees a report evaluating the feasibility, infrastructure readiness, and cost-benefits of co-locating permanent, manned flying missions at Air National Guard installations that currently possess active runways but lack manned active aircraft. (b) Elements The report required under subsection (a) shall include the following: (1) An inventory of Air National Guard installations described in subsection (a) that possess active runway infrastructure of 9,000 feet or greater, secure military enclaves, and proximity to regional training corridors or geographic commands. (2) An assessment of the capacity of such joint-use commercial airfield infrastructure, including taxiways and secure ramp space, to host permanent or distributed strategic assets. (3) An evaluation of the workforce readiness and technical expertise, including cyber, intelligence, and remotely piloted aircraft operations, to support advanced manned flying missions. (4) An assessment of alternative or distributed basing options required to support strategic long-range strike systems in the event that total procurement exceeds the initial program of record.