Architectural and engineering services and construction design; design-build selection procedures
Division C — Department of Energy National Security Authorizations and Other Authorizations › Title XXXV — Maritime Administration › Subtitle D — Coast Guard
Read this section in the full bill →
This section appears in one version only, so there is nothing to compare yet.
Subchapter I of chapter 11 of title 14, United States Code, is amended by adding at the end the following: 1112. Architectural and engineering services and construction design (a) In general The Secretary may obtain architectural and engineering services and may carry out construction design in connection with the construction of facilities authorized under section 4902(2)(A). (b) Notification (1) In general In the case of architectural and engineering services and construction design to be undertaken under subsection (a) for which the estimated cost exceeds $5,000,000, the Secretary shall notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate of the scope of the proposed project and the estimated cost of such services before the initial obligation of funds for such services. (2) Timing of obligation The Secretary may obligate funds for services described in paragraph (1) only after the end of the 14-day period beginning on the date on which the notification is provided to the Committees under paragraph (1). 1113. Design-build selection procedures Unless the traditional acquisition approach of design-bid-build established under chapter 11 of title 40 is used, or another acquisition procedure authorized by law is used, when entering into a contract for the design and construction of facilities authorized under section 4902(2)(A), the Secretary shall use the two-phase selection procedures authorized in subsections (a) through (e) of section 3241 of title 10, if such project is determined appropriate for the use of such a two-phase project when the criteria use included in section 3241(b) are applied to the project..