Sec. 202 · H.R. 9497

Expedited completion

Title II — Studies and Reports

Read this section in the full bill →

The wording changed from Committee version to Passed the House. Removed words are struck through; added words are underlined.

How the text changed

Committee version · Sec. 202

(a) Feasibility studies The Secretary shall expedite the completion of a feasibility study or general reevaluation report (as applicable) for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project: (1) Project for storm damage prevention and reduction, coastal erosion, and ice and glacial damage in the State of Alaska, authorized by section 8315 of the Water Resources Development Act of 2022 (136 Stat. 3783). (2) Project for reallocation of water supply storage, Greers Ferry Lake, Arkansas, authorized pursuant to section 301 of the Water Supply Act of 1958 (43 U.S.C. 390b). (3) Project for flood control and allied purposes, Homer Navigation Improvements, Alaska, authorized pursuant to section 204 of the Flood Control Act of 1948 (62 Stat. 1181). (4) Project for navigation, Port of Nome Modifications, Alaska, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2733). (5) Project for flood risk management, Cave Buttes Dam, Phoenix, Arizona, authorized by section 1201(a)(1) of the Water Resources Development Act of 2018 (132 Stat. 3802). (6) Project for flood risk management, McMicken Dam and Trilby Wash, Maricopa County, Arizona, authorized by section 8201 of the Water Resources Development Act of 2022 (136 Stat. 3744; 138 Stat. 3065). (7) Project for ecosystem restoration, Rio Salado Oeste, Phoenix, Arizona, authorized pursuant to section 6 of the Act of June 28, 1938 (chapter 795, 52 Stat. 1225). (8) Project for flood risk management, Yavapai County, in the vicinity of the City of Cottonwood, Arizona, authorized by section 1201(a)(1) of the Water Resources Development Act of 2024 (138 Stat. 3050). (9) Project for flood control and other purposes, Calaveras River and Littlejohn Creek and tributaries, California, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 902; 138 Stat. 3058). (10) Project for flood risk management, water supply, and ecosystem restoration, Chowchilla River, Ash Slough, and Berenda Slough, Madera County, California, authorized by section 6 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1595; 52 Stat. 1225; 138 Stat. 3059). (11) Project for flood control, water conservation, environmental restoration, water supply, and related purposes, Coyote Valley Dam, California, authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 177; 130 Stat. 1682; 132 Stat. 3803; 134 Stat. 2672; 136 Stat. 3835; 138 Stat. 3065). (12) Project for ecosystem restoration and water supply conservation and recharge, Eastman Lake, California, authorized by section 1201(a)(4) of the Water Resources Development Act of 2024 (138 Stat. 3050). (13) Project for flood control, environmental restoration, and recreation, Murrieta Creek, California, authorized by section 103 of title I of appendix B of Public Law 106–377 (114 Stat. 1441A–65; 136 Stat. 3786). (14) Project for ecosystem restoration, City of Petaluma, California, authorized by section 8201(a)(6) of the Water Resources Development Act of 2022 (136 Stat. 3745). (15) Project for ecosystem restoration, water supply, and recreation, Pine Flat Dam, Fresno County, California, authorized by section 1201(a)(7) of the Water Resources Development Act of 2024 (138 Stat. 3050). (16) Project for flood control, Redbank and Fancher Creeks, California, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4112). (17) Project for flood risk management and ecosystem restoration, Salinas River, California, authorized by section 1201(a)(9) of the Water Resources Development Act of 2024 (138 Stat. 3050). (18) Project for flood risk management, including sea level rise, San Diego Bay, California, authorized by section 1201(a)(11) of the Water Resources Development Act of 2024 (138 Stat. 3050). (19) Project for flood risk management, including stormwater runoff reduction, City of San Mateo, California, authorized by section 1201(a)(14) of the Water Resources Development Act of 2024 (138 Stat. 3051). (20) Project for ecosystem restoration, Central and South Florida, Comprehensive Everglades Restoration Program, Lake Okeechobee Watershed Restoration, Florida, authorized pursuant to section 601(d)(2)(B) of the Water Resources Development Act of 2000 (114 Stat. 2680; 121 Stat. 1179; 134 Stat. 2673; 136 Stat. 3761; 138 Stat. 3067). (21) Project for flood risk management, water supply, ecosystem restoration, recreation, and related purposes, Lake Istokpoga, Florida, authorized pursuant to section 8214 of the Water Resources Development Act of 2022 (136 Stat. 3759). (22) Project for ecosystem restoration, Lake Runnymede, Florida, authorized by section 8201(a)(16) of the Water Resources Development Act of 2022 (136 Stat. 3745). (23) Project for ecosystem restoration and flood risk management, Lake Tohopekaliga, Florida, authorized by section 8201(a)(19) of the Water Resources Development Act of 2022 (136 Stat. 3745). (24) Project for hurricane and storm damage risk reduction and ecosystem restoration in the vicinity of MacDill Air Force Base, City of Tampa, Florida, authorized by section 1201(a)(37) of the Water Resources Development Act of 2024 (138 Stat. 3052). (25) Project for hurricane and storm damage risk reduction, Port Tampa Bay, Florida, including McKay Bay, authorized by section 8201(a)(18) of the Water Resources Development Act of 2022 (136 Stat. 3745). (26) Project for flood risk management, ecosystem restoration, and water storage, Shingle Creek and Kissimmee River, Osceola County, Florida, authorized by section 201(a)(5) of the Water Resources Development Act of 2020 (134 Stat. 2670; 136 Stat. 3749). (27) Project for hurricane and storm damage risk reduction and coastal storm risk management, Volusia County, Florida, authorized by the resolution of the Committee on Transportation and Infrastructure of the House of Representatives, dated February 16, 2000, and required to be expedited by section 1203(a)(14) of the Water Resources Development Act of 2024 (138 Stat. 3065). (28) Project for local flood protection, Hanapēpē River, island of Kaua‘i, Hawaii, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 903; 138 Stat. 3060). (29) Project for flood risk management, Kaiaka-Waialua watershed, O‘ahu, Hawaii, authorized pursuant to section 1201(a)(45) of the Water Resources Development Act of 2024 (138 Stat. 3052). (30) Project for flood risk management and coastal storm risk management, County of Kaua‘i, Hawaii, authorized pursuant to section 1201(a)(46) of the Water Resources Development Act of 2024 (138 Stat. 3052). (31) Project for flood risk management and ecosystem restoration, County of Maui, Hawaii, authorized by section 1201(a)(47) of the Water Resources Development Act of 2024 (138 Stat. 3052). (32) Project for flood control and allied purposes, Wailupe Stream, ‘Āina Haina, Honolulu, Hawaii, authorized pursuant to section 209 of the Flood Control Act of 1962 (76 Stat. 1197). (33) Project for flood risk management, Waimea River, County of Kaua‘i, Hawaii, authorized pursuant to section 216 of the Flood Control Act of 1970 (84 Stat. 1830). (34) Project for flood risk management, Hoosic River, Massachusetts, authorized pursuant to the resolution of the Committee on Transportation and Infrastructure of the House of Representatives adopted on December 2, 2010 (docket number 2828) for environmental restoration, streambank stabilization, flood risk management, watershed management, floodplain management, and other allied purposes. (35) Project for navigation, Saginaw River, Michigan, authorized pursuant to section 456 of the Water Resources Development Act of 1999 (113 Stat. 332). (36) Project for flood risk management and ecosystem restoration, Tittabawassee River, Chippewa River, Pine River, and Tobacco River, Michigan, authorized by section 8201(a)(46) of the Water Resources Development Act of 2022 (136 Stat. 3747). (37) Project for flood control of the Mississippi River in its alluvial valley and for its improvement from the Head of the Passes to Cape Girardeau, Missouri, authorized by the first section of the Act of May 15, 1928 (chapter 569, 45 Stat. 534; 138 Stat. 3060). (38) Project for flood risk management, Berry’s Creek, New Jersey, authorized by section 1201(a)(91) of the Water Resources Development Act of 2024 (138 Stat. 3055). (39) Project for storm damage reduction and shoreline protection, including the engineering documentation report, Brigantine Inlet to Great Egg Harbor Inlet, Absecon Island, New Jersey, authorized by section 101(b)(13) of the Water Resources Development Act of 1996 (110 Stat. 3668). (40) Project for flood risk management, Fleischer Brook, New Jersey, authorized by section 1201(a)(92) of the Water Resources Development Act of 2024 (138 Stat. 3055). (41) Project for flood risk management and hydropower, Great Falls Raceway, Paterson, New Jersey, authorized by section 1201(a)(93) of the Water Resources Development Act of 2024 (138 Stat. 3055). (42) General reevaluation report for the project for flood risk management, Green Brook Sub-basin, Raritan River Basin, New Jersey, authorized by section 401 of the Water Resources Development Act of 1986 (100 Stat. 4119; 134 Stat. 2671; 138 Stat. 3066). (43) General reevaluation report for the project for hurricane and storm damage, Hereford Inlet to Cape May Inlet, Cape May County, New Jersey, authorized by section 1401(3) of the Water Resources Development Act of 2016 (130 Stat. 1712). (44) Project for flood risk management, Ho-Ho-Kus Brook and Saddle River, Village of Ridgewood, New Jersey, authorized by section 1201(a)(98) of the Water Resources Development Act of 2024 (138 Stat. 3055). (45) Project for flood risk management and ecosystem restoration, Passaic River Basin, Bergen, Essex, Hudson, Morris, and Passaic Counties, New Jersey, authorized by section 1201(a)(95) of the Water Resources Development Act of 2024 (138 Stat. 3055). (46) Project for navigation and flood risk management, Passaic River, Paterson, New Jersey, authorized by section 1201(a)(96) of the Water Resources Development Act of 2024 (138 Stat. 3055). (47) Project for navigation, Borough of Paulsboro, New Jersey, authorized by section 1201(a)(97) of the Water Resources Development Act of 2024 (138 Stat. 3055). (48) Project for flood risk management along the Peckman River Basin in the townships of Verona (and surrounding area), Cedar Grove, and West Caldwell, New Jersey, authorized by section 8201(a)(58) of the Water Resources Development Act of 2022 (136 Stat. 3747). (49) Project for flood risk management, Whippany River Watershed, Morris County, New Jersey, authorized by section 8201(a)(59) of the Water Resources Development Act of 2022 (136 Stat. 3747). (50) Project for flood risk management, Wolf Creek, New Jersey, authorized by section 1201(a)(99) of the Water Resources Development Act of 2024 (138 Stat. 3055). (51) Project for storm damage reduction, to include additional replacement of beach groins, Long Beach, New York, authorized by section 101(a)(21) of the Water Resources Development Act of 1996 (110 Stat. 3665; 138 Stat. 3061). (52) Project for ecosystem restoration, Great Salt Lake, Utah, authorized by section 8201(a)(88) of the Water Resources Development Act of 2022 (136 Stat. 3749). (53) Project for coastal storm risk management, Virginia Coastal Storm Risk Management, authorized pursuant to the Act of June 15, 1955 (chapter 140, 69 Stat. 132). (b) Study reports The Secretary shall expedite the completion of a final report of the Chief of Engineers or other decision document, as applicable, for each of the following projects for the project to be considered for authorization: (1) Project for flood risk management, Selma Flood Risk Management and Bank Stabilization, Alabama, authorized by section 8401(2) of the Water Resources Development Act of 2022 (136 Stat. 3839). (2) Project for ecosystem restoration, Salt River (Va Shly’Ay Akimel), Maricopa County, Arizona, as authorized by section 6 of the Act of June 28, 1938 (chapter 795, 52 Stat. 1225). (3) Study for repairs to recontour and stabilize the slope at Dardanelle Lock and Dam, Arkansas, authorized pursuant to section 7 of the Act of July 24, 1946 (chapter 595, 60 Stat. 640). (4) Project for ecosystem restoration and recreation, Los Angeles River, California, as authorized by section 1407(7) of the Water Resources Development Act of 2016 (130 Stat. 1714). (5) Project for flood risk reduction, San Francisco Bay, California, authorized by section 142 of the Water Resources Development Act of 1976 (90 Stat. 2930; 100 Stat. 4158; 134 Stat. 2672; 138 Stat. 3136). (6) Project for ecosystem restoration, Central and South Florida, Comprehensive Everglades Restoration Program, Central Everglades Planning Project, Florida, authorized pursuant to section 601(d)(2)(b) of the Water Resources Development Act of 2000 (114 Stat. 2684; 110 Stat. 3767; 114 Stat. 2680; 121 Stat. 1052; 128 Stat. 1369; 130 Stat. 1713; 132 Stat. 3819; 136 Stat. 3791; 138 Stat. 3067). (7) Project for navigation, Port Everglades, Florida, authorized by section 1401(1) of the Water Resources Development Act of 2016 (130 Stat. 1709; 136 Stat. 3792). (8) Project for flood risk management and resiliency, Lower Missouri Jefferson City L–142 Flood Risk Management Study, Lower and Upper Missouri River Comprehensive Flood Protection, Missouri, authorized by section 2 of the Act of August 18, 1941 (chapter 377, 55 Stat. 646; 58 Stat. 897; 134 Stat. 2687). (9) Project for flood and storm damage reduction, New York and New Jersey Harbor and Tributaries, New York and New Jersey, as authorized by the Act of June 15, 1955 (chapter 140, 69 Stat. 132; 134 Stat. 2676; 138 Stat. 3152). (10) Project for coastal storm risk management, Nassau County Back Bays, New York, authorized pursuant to the Act of June 15, 1955 (chapter 140, 69 Stat. 132). (11) Project for navigation, Matagorda Ship Channel Improvement Project, Port Lavaca, Texas, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2734; 138 Stat. 3083). (12) Project for hurricane and storm damage reduction, navigation, and ecosystem restoration, Chincoteague Island, Virginia, authorized by section 1201(27) of the Water Resources Development Act of 2016 (130 Stat. 1683). (c) Watershed and river basin assessments The Secretary shall expedite the completion of an assessment under section 729 of the Water Resources Development Act of 1986 (33 U.S.C. 2267a) for Lower Rouge River Watershed, Michigan. (d) Dredged materials management plans The Secretary shall expedite the completion of a dredged material management plan for each of the following projects: (1) Homer Small Boat Harbor, Homer, Alaska, authorized pursuant to section 204 of the Flood Control Act of 1948 (62 Stat. 1181). (2) Ashtabula Harbor, Ohio, authorized by the first section of the Act of June 3, 1896 (chapter 314, 29 Stat. 209). (3) Cleveland Harbor, Ohio, authorized by the first section of the Act of August 14, 1876 (chapter 267, 19 Stat. 133; 100 Stat. 4095; 101 Stat. 1329–107). (e) Water control manuals The Secretary shall, to the maximum extent practicable, expedite completion of updates to the water control manuals at the Terminus Dam and Lake Kaweah Project, Kaweah River, California, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 901). (f) Issues Evaluation Studies The Secretary shall expedite the completion of the Issues Evaluation Study for Black Butte Lake, Stoney Creek, California, authorized pursuant to the Act of December 22, 1944 (chapter 665, 58 Stat. 900). (g) New York and New Jersey Harbor and Tributaries (1) Schedule Not later than 90 days after the date of enactment of this Act, the Secretary, in consultation with the non-Federal interests for the project described in subsection (b)(9), shall provide to such non-Federal interests and congressional delegations a schedule for completion of the final report of the Chief of Engineers and other project decision documents including— (A) the remaining study, review, decision milestones, and budget; (B) any separable elements, actionable elements, phases, reaches, or features expected to be advanced and the anticipated timeline for any such advancements for the duration of the project until completion; (C) the status of responses to public comments received on the 2022 Draft Integrated Feasibility Report and Tier 1 Environmental Impact Statement and Tentatively Selected Plan; and (D) any impediments to completion of the final report of the Chief of Engineers and any other decision document. (2) Briefings Until completion of the final report of the Chief of Engineers and other decision documents described in paragraph (1), the Secretary shall brief the non-Federal interests and congressional delegations not less frequently than once per quarter on the status of the project, including progress toward the milestones identified under paragraph (1). (3) Congressional reports Not later than 6 months after the date of enactment of this Act, and annually thereafter for a period of 5 years, the Secretary shall submit to Congress a report detailing the progress on the schedule for completion required under this subsection.

•HR 9497 RHSEC. 202
Passed the House · Sec. 202

(a) Feasibility studies The Secretary shall expedite the completion of a feasibility study or general reevaluation report (as applicable) for each of the following projects, and if the Secretary determines that the project is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project: (1) Project for storm damage prevention and reduction, coastal erosion, and ice and glacial damage in the State of Alaska, authorized by section 8315 of the Water Resources Development Act of 2022 (136 Stat. 3783). (2) Project for reallocation of water supply storage, Greers Ferry Lake, Arkansas, authorized pursuant to section 301 of the Water Supply Act of 1958 (43 U.S.C. 390b). (3) Project for flood control and allied purposes, Homer Navigation Improvements, Alaska, authorized pursuant to section 204 of the Flood Control Act of 1948 (62 Stat. 1181). (4) Project for navigation, Port of Nome Modifications, Alaska, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2733). (5) Project for flood risk management, Cave Buttes Dam, Phoenix, Arizona, authorized by section 1201(a)(1) of the Water Resources Development Act of 2018 (132 Stat. 3802). (6) Project for flood risk management, McMicken Dam and Trilby Wash, Maricopa County, Arizona, authorized by section 8201 of the Water Resources Development Act of 2022 (136 Stat. 3744; 138 Stat. 3065). (7) Project for ecosystem restoration, Rio Salado Oeste, Phoenix, Arizona, authorized pursuant to section 6 of the Act of June 28, 1938 (chapter 795, 52 Stat. 1225). (8) Project for flood risk management, Yavapai County, in the vicinity of the City of Cottonwood, Arizona, authorized by section 1201(a)(1) of the Water Resources Development Act of 2024 (138 Stat. 3050). (9) Project for flood control and other purposes, Calaveras River and Littlejohn Creek and tributaries, California, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 902; 138 Stat. 3058). (10) Project for flood risk management, water supply, and ecosystem restoration, Chowchilla River, Ash Slough, and Berenda Slough, Madera County, California, authorized by section 6 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1595; 52 Stat. 1225; 138 Stat. 3059). (11) Project for flood control, water conservation, environmental restoration, water supply, and related purposes, Coyote Valley Dam, California, authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 177; 130 Stat. 1682; 132 Stat. 3803; 134 Stat. 2672; 136 Stat. 3835; 138 Stat. 3065). (12) Project for ecosystem restoration and water supply conservation and recharge, Eastman Lake, California, authorized by section 1201(a)(4) of the Water Resources Development Act of 2024 (138 Stat. 3050). (13) Project for flood control, environmental restoration, and recreation, Murrieta Creek, California, authorized by section 103 of title I of appendix B of Public Law 106–377 (114 Stat. 1441A–65; 136 Stat. 3786). (14) Project for ecosystem restoration, City of Petaluma, California, authorized by section 8201(a)(6) of the Water Resources Development Act of 2022 (136 Stat. 3745). (15) Project for ecosystem restoration, water supply, and recreation, Pine Flat Dam, Fresno County, California, authorized by section 1201(a)(7) of the Water Resources Development Act of 2024 (138 Stat. 3050). (16) Project for flood control, Redbank and Fancher Creeks, California, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4112). (17) Project for flood risk management and ecosystem restoration, Salinas River, California, authorized by section 1201(a)(9) of the Water Resources Development Act of 2024 (138 Stat. 3050). (18) Project for flood risk management, including sea level rise, San Diego Bay, California, authorized by section 1201(a)(12) of the Water Resources Development Act of 2024 (138 Stat. 3050). (19) Project for flood risk management, including stormwater runoff reduction, City of San Mateo, California, authorized by section 1201(a)(14) of the Water Resources Development Act of 2024 (138 Stat. 3051). (20) Project for ecosystem restoration, Central and South Florida, Comprehensive Everglades Restoration Program, Lake Okeechobee Watershed Restoration, Florida, authorized pursuant to section 601(d)(2)(B) of the Water Resources Development Act of 2000 (114 Stat. 2680; 121 Stat. 1179; 134 Stat. 2673; 136 Stat. 3761; 138 Stat. 3067). (21) Project for flood risk management, water supply, ecosystem restoration, recreation, and related purposes, Lake Istokpoga, Florida, authorized pursuant to section 8214 of the Water Resources Development Act of 2022 (136 Stat. 3759). (22) Project for ecosystem restoration, Lake Runnymede, Florida, authorized by section 8201(a)(16) of the Water Resources Development Act of 2022 (136 Stat. 3745). (23) Project for ecosystem restoration and flood risk management, Lake Tohopekaliga, Florida, authorized by section 8201(a)(19) of the Water Resources Development Act of 2022 (136 Stat. 3745). (24) Project for hurricane and storm damage risk reduction and ecosystem restoration in the vicinity of MacDill Air Force Base, City of Tampa, Florida, authorized by section 1201(a)(37) of the Water Resources Development Act of 2024 (138 Stat. 3052). (25) Project for hurricane and storm damage risk reduction, Port Tampa Bay, Florida, including McKay Bay, authorized by section 8201(a)(18) of the Water Resources Development Act of 2022 (136 Stat. 3745). (26) Project for flood risk management, ecosystem restoration, and water storage, Shingle Creek and Kissimmee River, Osceola County, Florida, authorized by section 201(a)(5) of the Water Resources Development Act of 2020 (134 Stat. 2670; 136 Stat. 3749). (27) Project for hurricane and storm damage risk reduction and coastal storm risk management, Volusia County, Florida, authorized by the resolution of the Committee on Transportation and Infrastructure of the House of Representatives, dated February 16, 2000, and required to be expedited by section 1203(a)(14) of the Water Resources Development Act of 2024 (138 Stat. 3065). (28) Project for local flood protection, Hanapēpē River, island of Kaua‘i, Hawaii, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 903; 138 Stat. 3060). (29) Project for flood risk management, Kaiaka-Waialua watershed, O‘ahu, Hawaii, authorized pursuant to section 1201(a)(45) of the Water Resources Development Act of 2024 (138 Stat. 3052). (30) Project for flood risk management and coastal storm risk management, County of Kaua‘i, Hawaii, authorized pursuant to section 1201(a)(46) of the Water Resources Development Act of 2024 (138 Stat. 3052). (31) Project for flood risk management and ecosystem restoration, County of Maui, Hawaii, authorized by section 1201(a)(47) of the Water Resources Development Act of 2024 (138 Stat. 3052). (32) Project for flood control and allied purposes, Wailupe Stream, ‘Āina Haina, Honolulu, Hawaii, authorized pursuant to section 209 of the Flood Control Act of 1962 (76 Stat. 1197). (33) Project for flood risk management, Waimea River, County of Kaua‘i, Hawaii, authorized pursuant to section 216 of the Flood Control Act of 1970 (84 Stat. 1830). (34) Project for flood risk management, Hoosic River, Massachusetts, authorized pursuant to the resolution of the Committee on Transportation and Infrastructure of the House of Representatives adopted on December 2, 2010 (docket number 2828) for environmental restoration, streambank stabilization, flood risk management, watershed management, floodplain management, and other allied purposes. (35) Project for navigation, Saginaw River, Michigan, authorized pursuant to section 456 of the Water Resources Development Act of 1999 (113 Stat. 332). (36) Project for flood risk management and ecosystem restoration, Tittabawassee River, Chippewa River, Pine River, and Tobacco River, Michigan, authorized by section 8201(a)(46) of the Water Resources Development Act of 2022 (136 Stat. 3747). (37) Project for flood control of the Mississippi River in its alluvial valley and for its improvement from the Head of the Passes to Cape Girardeau, Missouri, authorized by the first section of the Act of May 15, 1928 (chapter 569, 45 Stat. 534; 138 Stat. 3060). (38) Project for flood risk management, Berry’s Creek, New Jersey, authorized by section 1201(a)(91) of the Water Resources Development Act of 2024 (138 Stat. 3055). (39) Project for storm damage reduction and shoreline protection, including the engineering documentation report, Brigantine Inlet to Great Egg Harbor Inlet, Absecon Island, New Jersey, authorized by section 101(b)(13) of the Water Resources Development Act of 1996 (110 Stat. 3668). (40) Project for flood risk management, Fleischer Brook, New Jersey, authorized by section 1201(a)(92) of the Water Resources Development Act of 2024 (138 Stat. 3055). (41) Project for flood risk management and hydropower, Great Falls Raceway, Paterson, New Jersey, authorized by section 1201(a)(93) of the Water Resources Development Act of 2024 (138 Stat. 3055). (42) General reevaluation report for the project for flood risk management, Green Brook Sub-basin, Raritan River Basin, New Jersey, authorized by section 401 of the Water Resources Development Act of 1986 (100 Stat. 4119; 134 Stat. 2671; 138 Stat. 3066). (43) General reevaluation report for the project for hurricane and storm damage, Hereford Inlet to Cape May Inlet, Cape May County, New Jersey, authorized by section 1401(3) of the Water Resources Development Act of 2016 (130 Stat. 1712). (44) Project for flood risk management, Ho-Ho-Kus Brook and Saddle River, Village of Ridgewood, New Jersey, authorized by section 1201(a)(98) of the Water Resources Development Act of 2024 (138 Stat. 3055). (45) Project for flood risk management and ecosystem restoration, Passaic River Basin, Bergen, Essex, Hudson, Morris, and Passaic Counties, New Jersey, authorized by section 1201(a)(95) of the Water Resources Development Act of 2024 (138 Stat. 3055). (46) Project for navigation and flood risk management, Passaic River, Paterson, New Jersey, authorized by section 1201(a)(96) of the Water Resources Development Act of 2024 (138 Stat. 3055). (47) Project for navigation, Borough of Paulsboro, New Jersey, authorized by section 1201(a)(97) of the Water Resources Development Act of 2024 (138 Stat. 3055). (48) Project for flood risk management along the Peckman River Basin in the townships of Verona (and surrounding area), Cedar Grove, and West Caldwell, New Jersey, authorized by section 8201(a)(58) of the Water Resources Development Act of 2022 (136 Stat. 3747). (49) Project for flood risk management, Whippany River Watershed, Morris County, New Jersey, authorized by section 8201(a)(59) of the Water Resources Development Act of 2022 (136 Stat. 3747). (50) Project for flood risk management, Wolf Creek, New Jersey, authorized by section 1201(a)(99) of the Water Resources Development Act of 2024 (138 Stat. 3055). (51) Project for storm damage reduction, to include additional replacement of beach groins, Long Beach, New York, authorized by section 101(a)(21) of the Water Resources Development Act of 1996 (110 Stat. 3665; 138 Stat. 3061). (52) Project for ecosystem restoration, Great Salt Lake, Utah, authorized by section 8201(a)(88) of the Water Resources Development Act of 2022 (136 Stat. 3749). (53) Project for coastal storm risk management, Virginia Coastal Storm Risk Management, authorized pursuant to the Act of June 15, 1955 (chapter 140, 69 Stat. 132). (b) Study reports The Secretary shall expedite the completion of a final report of the Chief of Engineers or other decision document, as applicable, for each of the following projects for the project to be considered for authorization: (1) Project for flood risk management, Selma Flood Risk Management and Bank Stabilization, Alabama, authorized by section 8401(2) of the Water Resources Development Act of 2022 (136 Stat. 3839). (2) Project for ecosystem restoration, Salt River (Va Shly’Ay Akimel), Maricopa County, Arizona, as authorized by section 6 of the Act of June 28, 1938 (chapter 795, 52 Stat. 1225). (3) Study for repairs to recontour and stabilize the slope at Dardanelle Lock and Dam, Arkansas, authorized pursuant to section 7 of the Act of July 24, 1946 (chapter 595, 60 Stat. 640). (4) Project for ecosystem restoration and recreation, Los Angeles River, California, as authorized by section 1407(7) of the Water Resources Development Act of 2016 (130 Stat. 1714). (5) Project for flood risk reduction, San Francisco Bay, California, authorized by section 142 of the Water Resources Development Act of 1976 (90 Stat. 2930; 100 Stat. 4158; 134 Stat. 2672; 138 Stat. 3136). (6) Project for ecosystem restoration, Central and South Florida, Comprehensive Everglades Restoration Program, Central Everglades Planning Project, Florida, authorized pursuant to section 601(d)(2)(b) of the Water Resources Development Act of 2000 (114 Stat. 2684; 110 Stat. 3767; 114 Stat. 2680; 121 Stat. 1052; 128 Stat. 1369; 130 Stat. 1713; 132 Stat. 3819; 136 Stat. 3791; 138 Stat. 3067). (7) Project for navigation, Port Everglades, Florida, authorized by section 1401(1) of the Water Resources Development Act of 2016 (130 Stat. 1709; 136 Stat. 3792). (8) Project for flood risk management and resiliency, Lower Missouri Jefferson City L–142 Flood Risk Management Study, Lower and Upper Missouri River Comprehensive Flood Protection, Missouri, authorized by section 2 of the Act of August 18, 1941 (chapter 377, 55 Stat. 646; 58 Stat. 897; 134 Stat. 2687). (9) Project for flood and storm damage reduction, New York and New Jersey Harbor and Tributaries, New York and New Jersey, as authorized by the Act of June 15, 1955 (chapter 140, 69 Stat. 132; 134 Stat. 2676; 138 Stat. 3152). (10) Project for coastal storm risk management, Nassau County Back Bays, New York, authorized pursuant to the Act of June 15, 1955 (chapter 140, 69 Stat. 132). (11) Project for navigation, Matagorda Ship Channel Improvement Project, Port Lavaca, Texas, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2734; 138 Stat. 3083). (12) Project for hurricane and storm damage reduction, navigation, and ecosystem restoration, Chincoteague Island, Virginia, authorized by section 1201(27) of the Water Resources Development Act of 2016 (130 Stat. 1683). (c) Watershed and river basin assessments The Secretary shall expedite the completion of an assessment under section 729 of the Water Resources Development Act of 1986 (33 U.S.C. 2267a) for Lower Rouge River Watershed, Michigan. (d) Dredged materials management plans The Secretary shall expedite the completion of a dredged material management plan for each of the following projects: (1) Homer Small Boat Harbor, Homer, Alaska, authorized pursuant to section 204 of the Flood Control Act of 1948 (62 Stat. 1181). (2) Ashtabula Harbor, Ohio, authorized by the first section of the Act of June 3, 1896 (chapter 314, 29 Stat. 209). (3) Cleveland Harbor, Ohio, authorized by the first section of the Act of August 14, 1876 (chapter 267, 19 Stat. 133; 100 Stat. 4095; 101 Stat. 1329–107). (e) Water control manuals The Secretary shall, to the maximum extent practicable, expedite completion of updates to the water control manuals at the Terminus Dam and Lake Kaweah Project, Kaweah River, California, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 901). (f) Issues Evaluation Studies The Secretary shall expedite the completion of the Issues Evaluation Study for Black Butte Lake, Stoney Creek, California, authorized pursuant to the Act of December 22, 1944 (chapter 665, 58 Stat. 900). (g) New York and New Jersey Harbor and Tributaries (1) Schedule Not later than 90 days after the date of enactment of this Act, the Secretary, in consultation with the non-Federal interests for the project described in subsection (b)(9), shall provide to such non-Federal interests and congressional delegations a schedule for completion of the final report of the Chief of Engineers and other project decision documents including— (A) the remaining study, review, decision milestones, and budget; (B) any separable elements, actionable elements, phases, reaches, or features expected to be advanced and the anticipated timeline for any such advancements for the duration of the project until completion; (C) the status of responses to public comments received on the 2022 Draft Integrated Feasibility Report and Tier 1 Environmental Impact Statement and Tentatively Selected Plan; and (D) any impediments to completion of the final report of the Chief of Engineers and any other decision document. (2) Briefings Until completion of the final report of the Chief of Engineers and other decision documents described in paragraph (1), the Secretary shall brief the non-Federal interests and congressional delegations not less frequently than once per quarter on the status of the project, including progress toward the milestones identified under paragraph (1). (3) Congressional reports Not later than 6 months after the date of enactment of this Act, and annually thereafter for a period of 5 years, the Secretary shall submit to Congress a report detailing the progress on the schedule for completion required under this subsection.

•HR 9497 EHSEC. 202

added wordsremoved wordsComparison computed by Public Law Tracker from the official text

Sec. 202: Expedited completion · Public Law Tracker