Early access: 15,547 bills from the current Congress so far, more added daily. Data from Congress.gov, GovInfo and the House and Senate vote records, updated Oct 13, 2026.
Public Law TrackerPLTPublic Law Tracker
H.R. 9497IntroducedHouseSenate · nowPresidentLawIn the Senate
Sec. 203 · H.R. 9497

Expedited modification of existing feasibility studies

Title II — Studies and Reports

Read this section in the full bill →

The wording changed from Introduced to Committee version. Removed words are struck through; added words are underlined.

How the text changed

Introduced · Sec. 203

(a) Unalaska (Dutch Harbor), Alaska modification The feasibility study for navigation, Unalaska (Dutch Harbor) Channels, Alaska, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2734) is modified to authorize the Secretary to include in the study coastal storm risk management and shoreline erosion protection. (b) Alexandria to the Gulf of Mexico, Louisiana The feasibility study for flood control, navigation, wetland conservation and restoration, wildlife habitat, commercial and recreational fishing, saltwater intrusion, freshwater and sediment diversion, and other purposes, in the area drained by the intercepted drainage system of the West Atchafalaya Basin Protection Levee, from Alexandria, Louisiana to the Gulf of Mexico, being carried out under Committee Resolution 2535 of the Committee on Transportation and Infrastructure of the House of Representatives, adopted July 23, 1997, as authorized by section 1202(4) of the Water Resources Development Act of 2024 (138 Stat. 3064), is modified to include Vermilion Bay. (c) Expedited completion The Secretary shall expedite the completion of the feasibility studies described in subsections (a) and (b), as modified by such subsections, and if the Secretary determines that a project that is the subject of the feasibility study described in subsection (a) or (b) is justified in the completed report, may proceed directly to preconstruction planning, engineering, and design of the project.

•HR 9497 IHSEC. 203
Committee version · Sec. 203

(a) Unalaska (Dutch Harbor), Alaska modification The feasibility study for navigation, Unalaska (Dutch Harbor) Channels, Alaska, authorized by section 401(1) of the Water Resources Development Act of 2020 (134 Stat. 2734) is modified to authorize the Secretary to include in the study coastal storm risk management and shoreline erosion protection. (b) Columbus and Hickman, Kentucky The feasibility study for the project for flood risk management, including riverbank stabilization, Columbus, Kentucky, authorized by section 8201(a)(28) of the Water Resources Development Act of 2022 (136 Stat. 3746), is modified to authorize the Secretary to include in the study bluff stabilization as an authorized purpose and to include in the study area the City of Hickman, Kentucky. (c) Alexandria to the Gulf of Mexico, Louisiana The feasibility study for flood control, navigation, wetland conservation and restoration, wildlife habitat, commercial and recreational fishing, saltwater intrusion, freshwater and sediment diversion, and other purposes, in the area drained by the intercepted drainage system of the West Atchafalaya Basin Protection Levee, from Alexandria, Louisiana to the Gulf of Mexico, being carried out under Committee Resolution 2535 of the Committee on Transportation and Infrastructure of the House of Representatives, adopted July 23, 1997, as authorized by section 1202(4) of the Water Resources Development Act of 2024 (138 Stat. 3064), is modified to include Vermilion Bay. (d) Maurice River, New Jersey The feasibility study for the project for navigation and for beneficial use of dredged materials for hurricane and storm damage risk reduction and ecosystem restoration, Maurice River, New Jersey, authorized by section 8201(a)(53) of the Water Resources Development Act of 2022 (136 Stat. 3747), is modified to authorize the Secretary to include streambank erosion and shoreline protection and to include in the study area the East Point Lighthouse. (e) Expedited completion The Secretary shall expedite the completion of the feasibility studies described in subsections (a) through (d), as modified by such subsections, and if the Secretary determines that a project that is the subject of the feasibility study described in subsection (a), (b), (c), or (d) is justified in the completed report, may proceed directly to preconstruction planning, engineering, and design of the project.

•HR 9497 RHSEC. 203

added wordsremoved wordsComparison computed by Public Law Tracker from the official text

Sec. 203: Expedited modification of existing feasibility studies · Public Law Tracker