Great Lakes and Mississippi River Interbasin project, Brandon Road, Will County, Illinois
Title II — Studies and Reports
Read this section in the full bill →
The wording changed from Introduced to Committee version. Removed words are struck through; added words are underlined.
How the text changed
Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that includes— (1) the results of an assessment to identify any contaminated sediments associated with the project for ecosystem restoration, Great Lakes and Mississippi River Interbasin Study—Brandon Study – Brandon Road, Will County, Illinois, authorized by section 401(5) of the Water Resources Development Act of 2020 (134 Stat. 2740); and (2) a plan, developed in coordination with the non-Federal interest for such project, to remediate such sediments simultaneously with construction of the project.
added wordsremoved wordsComparison computed by Public Law Tracker from the official text