Specific deauthorizations
Title III — Deauthorizations and Modifications
Read this section in the full bill →
The wording changed from Committee version to Passed the House. Removed words are struck through; added words are underlined.
How the text changed
(a) Deauthorization of designated portions of Los Angeles County Drainage Area, California (1) In general The portion of the project for flood risk management, Los Angeles County Drainage Area, California, authorized by section 5 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1589; 50 Stat. 167; 52 Stat. 1215; 55 Stat. 647; 64 Stat. 177; 104 Stat. 4611; 136 Stat. 3785; 138 Stat. 3019), consisting of the flood channels described in paragraph (2), is no longer authorized beginning on the date of enactment of this Act. (2) Flood channels described The flood channels referred to in paragraph (1) are the following flood channels operated and maintained by the Los Angeles County Flood Control District, as generally defined in Corps of Engineers operations and maintenance manuals: (A) Alhambra Wash Channel (Valley Blvd. to Rio Hondo). (B) Arcadia Wash Channel. (C) Ballona Creek Channel (La Salle Ave. to Vista Del Mar). (D) Ballona Creek Channel (Redondo Blvd. to Washington Blvd.). (E) Benedict Canyon Channel. (F) Burbank Western Channel (Roscoe Blvd. to Victory Blvd.). (G) Caballero Creek Channel. (H) Centinela Creek Channel. (I) Compton Creek Channel (Main St. to 122nd St.). (J) Compton Creek Channel (Southern Pacific Rail Yard to Los Angeles River). (K) Coyote Creek Channel (Valley View St. to San Gabriel River). (L) Eaton Wash Channel. (M) Grandview Ave Channel. (N) Haines Canyon Channel (Plainview Ave. to Tujunga Wash). (O) Kenter Canyon Channel. (P) Lopez Canyon Diversion Channel. (Q) Los Angeles River (Owensmouth Ave. to Sepulveda Flood Control Basin). (R) Los Angeles River (Sepulveda Flood Control Basin to Lankershim Blvd.). (S) Los Angeles River (Stewart and Grey Rd. to Pacific Ocean). (T) North Fork Channel. (U) Pacoima Wash Channel. (V) Rio Hondo Channel (Lower Azusa Rd. to Rosemead Blvd.). (W) Rio Hondo Channel (500 ft. south of Whittier Narrows Dam to Union Pacific Rail Yard). (X) Rubio Wash Channel. (Y) San Gabriel River Channel (Santa Fe Flood Control Basin to Thienes Ave.). (Z) San Gabriel River Channel (Whittier Narrows Dam to Pacific Ocean). (AA) San Jose Creek Channel (Thomas Creek to San Jose Creek Diversion). (BB) Santa Anita Wash Channel. (CC) Sawpit Wash Channel. (DD) Sawtelle–Westwood Channel. (EE) Sycamore Wash Channel. (FF) Tujunga Wash Channel (436 ft. south of Hansen Dam to Los Angeles River). (GG) Verdugo Wash Channel (Verdugo Debris Basin to San Fernando Rd.). (3) Repeal The following are repealed: (A) Subsections (c) and (d) of section 8320 of the Water Resources Development Act of 2022 (136 Stat. 3785). (B) Paragraphs (3) and (4) of section 1302(b) of the Water Resources Development Act of 2024 (138 Stat. 3109). (b) Lower San Joaquin River and tributaries, California (1) In general The portion of the project for flood protection on the Lower San Joaquin River and tributaries, California, authorized by section 10 of the Act of December 22, 1944 (chapter 665, 58 Stat. 901), consisting of the 3.76 mile Dos Rios Levee along the right bank of the San Joaquin River between River Mile 88 and River Mile 85, is no longer authorized beginning on the date of enactment of this Act. (2) Repeal Section 1302(p) of the Water Resources Development Act of 2024 (138 Stat. 3114) is repealed. (c) Upper St. Anthony Falls Lock and Dam, Minneapolis, Minnesota Section 2010 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1270; 132 Stat. 3812; 136 Stat. 3795) is amended by adding at the end the following: (h) Clarification (1) In general Notwithstanding the requirements of section 356(f) of the Water Resources Development Act of 2020 (134 Stat. 2724; 138 Stat. 3141), the Secretary shall retain ownership of, and operation and maintenance responsibility for, the underwater cutoff wall constructed by the Secretary on the riverbed in the vicinity of St. Anthony Falls, Minnesota. (2) Assessment Not later than 1 year after the date of enactment of this subsection, the Secretary shall complete and transmit to the State of Minnesota and to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate an assessment of the condition of the underwater cutoff wall described in paragraph (1).. (d) Harlem River Federal Navigation Channel, New York (1) In general Beginning on the date of enactment of this Act, the project for navigation, Harlem River, New York, authorized by the first section of the Act of June 18, 1878 (chapter 264, 20 Stat. 158) is modified to deauthorize the portion of the project consisting of the areas described in paragraph (2). (2) Areas described The areas referred to in paragraph (1) are— (A) the area that is a closed polygon formed by straight lines connecting, in the order listed, the following points, and thence extending landward to the existing physical shoreline— (i) beginning at a point on the shoreline north of the Macombs Dam Bridge at N244191.72, E1002503.69; (ii) running south-southwesterly approximately 59.5 feet to a point at N244133.98, E1002489.25; (iii) running south-southwesterly approximately 579.8 feet to a point at N243572.61, E1002344.44; (iv) running southerly approximately 173.9 feet to a point at N243399.67, E1002326.56; (v) running southerly approximately 189.0 feet to a point at N243212.20, E1002302.50; (vi) running southerly approximately 354.4 feet to a point at N242858.69, E1002277.63; (vii) running southerly approximately 292.3 feet to a point at N242566.45, E1002281.31; (viii) running southerly approximately 791.2 feet to a point at N241778.27, E1002350.13; (ix) running southerly approximately 254.5 feet to a point at N241525.84, E1002382.88; (x) running southerly approximately.6 approximately 56.6 feet to a point at N241469.61, E1002389.06; (xi) running southerly approximately 190.2 feet to a point at N241280.22, E1002406.69; (xii) running southwesterly approximately 93.6 feet to a point at N241209.59, E1002345.25; and (xiii) running southwesterly approximately 15.4 feet terminating at a point on the shoreline at N241197.95, E1002335.13; and (B) the area that is a closed polygon formed by straight lines connecting, in the order listed, the following points, and thence extending landward to the existing physical shoreline— (i) beginning at a point on the shoreline south of the Macombs Dam Bridge at N240595.14, E1002396.69; (ii) running south-southeasterly approximately 30.5 feet to a point at N240569.30, E1002412.94; (iii) running south-southeasterly approximately 97.5 feet to a point at N240486.75, E1002464.88; (iv) running southerly approximately 477.6 feet to a point at N240010.61, E1002502.81; (v) running southerly approximately 60.4 feet to a point at N239950.33, E1002506.19; (vi) running southerly approximately 39.5 feet to a point at N239910.88, E1002506.94; (vii) running southerly approximately.3 approximately 137.3 feet to a point at N239773.63, E1002509.38; (viii) running southerly approximately 97.9 feet to a point at N239676.67, E1002523.13; (ix) running southerly approximately 58.1 feet to a point at N239618.58, E1002524.19; (x) running southerly approximately 289.1 feet to a point at N239330.02, E1002541.31; (xi) running southerly approximately 331.3 feet to a point at N238999.31, E1002560.94; (xii) running southerly approximately 583.2 feet to a point at N238416.61, E1002585.50; (xiii) running southerly approximately 387.8 feet to a point at N238029.20, E1002602.56; (xiv) running southerly approximately 120.0 feet to a point at N237909.23, E1002603.81; (xv) running west-northwesterly approximately 42 feet to a point at N237919.38, E1002563.06; and (xvi) running west-northwesterly approximately 1 foot to a point on the shoreline at N237919.63, E1002562.06. (e) Hudson River Channel partial deauthorization, New York (1) In general Beginning on the date of enactment of this Act, the project for navigation, Hudson River Channel, New York, authorized by the first section of the Act of March 4, 1913 (chapter 144, 37 Stat. 804), is modified to deauthorize the portion of the channel consisting of the area described in paragraph (2). (2) Area described The area referred to in paragraph (1) is the area bounded by the following coordinates: (A) W 740004.90, N 404615.84. (B) W 735957.24, N 404612.68. (C) W 740015.09, N 404601.62. (D) W 740007.71, N 404558.52. (f) Newtown Creek Federal Navigation Channel, New York (1) Definition of Newtown Creek, New York project In this subsection, the term Newtown Creek, New York project means the project for navigation, Newtown Creek, New York and associated tributaries, authorized by the first section of the Act of March 2, 1919 (chapter 95, 40 Stat. 1276; 46 Stat. 920; 50 Stat. 845; 138 Stat. 3113). (2) Modification Beginning on the date of enactment of this Act, the Newtown Creek, New York project is modified to reduce, in part, the authorized dimensions of the project, such that the remaining authorized depths are as follows: (A) A 20-foot deep channel with a center line beginning at point North 40.735668 and West 73.942159, thence to a point North 40.733648 and West 73.940546. (B) An 18-foot deep channel with a center line beginning at point North 40.733648 and West 73.940546, thence to a point North 40.722214 and West 73.925873. (C) An 18-foot deep turning basin southwest of a line formed by points North 40.726201 and West 73.927288; and North 40.723507 and West 73.924712. (D) A 16-foot-deep channel with a center line beginning at a point North 40.722214 and West 73.925873, thence to a point North 40.718066 and West 73.923931. (E) A 16-foot-deep channel with a center line beginning at a point North 40.718663 and West 73.924175, thence to a point North 40.717538 and West 73.927437. (F) A 14-foot-deep channel with a center line beginning at a point North 40.717538 and West 73.927437, thence to a point North 40.716610 and West 73.929278. (G) A 12-foot-deep channel with a center line beginning at a point North 40.716610 and West 73.929278, thence to a point North 40.713164 and West 73.931352. (3) Deauthorizations (A) In general The portions of the Newtown Creek navigation project described in subparagraph (B) are deauthorized beginning on the date of enactment of this Act. (B) Portions described The portions referred to in subparagraph (A) are— (i) the portion of the project adjacent to the turning basin consisting of— (I) the area east of a line formed by points North 40.726201 and West 73.927288; and North 40.723507 and West 73.924712; and (II) the area containing Maspeth Creek; (ii) the upstream portion of English Kills consisting of the area— (I) beginning at a point North 40.713164 and West 73.931352; and (II) extending upstream to the project boundary; and (iii) Dutch Kills, consisting of the area— (I) beginning at a point North 40.737623 and West 73.946809; and (II) extending upstream to the project boundary. (g) Charleston, South Carolina (1) Deauthorization Upon completion of the sale of the Union Pier marine terminal property and cessation of commercial port operations at the Union Pier marine terminal by the South Carolina Ports Authority, the project for navigation, Charleston Harbor, South Carolina, authorized by section 1401(1) of the Water Resources Development Act of 2016 (130 Stat. 1708) consisting of the area described in paragraph (2) is no longer authorized. (2) Portion described The area referred to in paragraph (1) is the portion of the Federal channel located within Charleston Harbor bounded by the following coordinates: 32° 47’ 14.9482” N, 79° 55’ 16.3495” W; to 32° 47’ 14.4485” N, 79° 55’ 23.8699” W; to 32° 46’ 39.2931” N, 79° 55’ 23.1766” W; to 32° 46’ 39.4002” N, 79° 55’ 15.564” W; to 32° 47’ 5.2545” N, 79° 55’ 16.0734” W; to 32° 47’ 9.6725” N, 79° 55’ 10.8883” W; thence back to 32° 47’ 14.9482” 14.4485” N, 79° 55’ 16.3495” 23.8699” W. (h) Shot Pouch Creek, South Carolina The project for snagging and clearing, Shot Pouch Creek, South Carolina, authorized by section 2 of August 28, 1937 (33 U.S.C. 701g), consisting of 2.15 miles of Shot Pouch Creek from the Sumter Bypass to Swan Lake, is no longer authorized beginning on the date of enactment of this Act.
added wordsremoved wordsComparison computed by Public Law Tracker from the official text