Early access: 15,547 bills from the current Congress so far, more added daily. Data from Congress.gov, GovInfo and the House and Senate vote records, updated Oct 13, 2026.
Public Law TrackerPLTPublic Law Tracker
H.R. 9497IntroducedHouseSenate · nowPresidentLawIn the Senate
Sec. 219 · H.R. 9497

Great Lakes and Mississippi River Interbasin project, Brandon Road, Will County, Illinois

Title II — Studies and Reports

Read this section in the full bill →

No wording changed between Committee version and Passed the House.

How the text changed

Committee version · Sec. 222

Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that includes— (1) the results of an assessment to identify any contaminated sediments associated with the project for ecosystem restoration, Great Lakes and Mississippi River Interbasin Study – Brandon Road, Will County, Illinois, authorized by section 401(5) of the Water Resources Development Act of 2020 (134 Stat. 2740); and (2) a plan, developed in coordination with the non-Federal interest for such project, to remediate such sediments simultaneously with construction of the project.

•HR 9497 RHSEC. 222
Passed the House · Sec. 222

Not later than 1 year after the date of enactment of this Act, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that includes— (1) the results of an assessment to identify any contaminated sediments associated with the project for ecosystem restoration, Great Lakes and Mississippi River Interbasin Study – Brandon Road, Will County, Illinois, authorized by section 401(5) of the Water Resources Development Act of 2020 (134 Stat. 2740); and (2) a plan, developed in coordination with the non-Federal interest for such project, to remediate such sediments simultaneously with construction of the project.

•HR 9497 EHSEC. 222

added wordsremoved wordsComparison computed by Public Law Tracker from the official text